| HALLIFORD CONSTRUCTION | |
| We are always very happy to quote for all your set requirements, whether you choose to build & shoot on Halliford's own stages, prefabricate in our workshops and transport, or to totally build off-site at any 4-waller or location. |
| We charge a 20% loading on all materials | By Quote |



| Workshops | |
| Our on-site purpose built and fully equipped Carpenter's and Paint Shops can meet all your set construction needs. They are conveniently close-to-hand to make any on the day changes of mind as painless as can be. | |
| Our Scene Docks hold a large selection of stock windows, doors and fireplaces etc. that your Art Director can utilise, and our extensive Prop Rooms are available for set storage if required. | |
|
Off-Stage
Build Days
|
£250.00
|
| Backings | |
| We do not hold stages ready-painted to a particular colour, nor do we ask you to return them to any colour. You are charged only for the whole or part-painting of the backing and/or floor to your production specification. | |
|
Painting
Costs
|
By
Quote
|
|
Backing
Rental Per Job
|
£110.00
|
| Labour | |
| Our Construction Manager is a permanent member of staff | |
|
Per
Day
|
£311.00
|
|
Our freelancers are all highly experienced Halliford regulars. |
|
|
Carpenter
|
As
per AFVPA
minimum
+ 20% load
|
|
Painter
|
|
|
All
Other Skilled
|
|
|
Stage
Hand
|
|
| Waste Disposal | |
| Charged at percentage of skip used | |
|
per
skip
|
£250.00
|
| Contact | CALLUM ANDREWS |